Skip to content

Latest Assessment

Use this page as the bridge between the historical reports and the current public docs.

Current Public Status Pages

Historical Reports

Reading These Reports

  • The 2026-03-29 assessment is the current post-PR180 baseline snapshot.
  • The 2026-03-19 assessment is a point-in-time audit, not the current site state.
  • The 2026-03-20 remediation summary records one remediation pass, not the final information architecture.
  • When the historical reports and the live docs disagree, prefer the current public status pages above.